The Lakers’ New Headquarter

29/07/16 0 COMMENTS

Scope of work: Network, Security, Communications and Data Center infrastructure.

 

 

Long Beach City College

29/07/16 0 COMMENTS

LBCC Rendering

Scope of work:Campus wide Network, Security, Fire Life Safety, Communications and Data Center infrastructure.

 

 

Rose Bowl

01/12/12 0 COMMENTS

Scope of work: Communication Equipment Room Fittings, Communication Backbone Cabling, Communication Horizontal Cabling

Contractor: Dynalectric

Foothill transits

03/05/12 0 COMMENTS

  • Scope of work: Installation of Mitel 3300 IP Phone system (6 locations)
  • Client: Foothill Transit

Los Angeles Health Services / MLK

03/05/12 0 COMMENTS

Los Angeles Health Services

  • Scope of Work: Inside Plant Communications Circuits, Outside Plant Communications Circuits, Communications Horizontal Cabling, Communications Backbone Cabling, Communications Equipment Room Fitting, Identification for Communications Systems, Common Work Results for Communications
  • Client: Martin Luther King, Jr. Mulch-Service Ambulatory Care Center, Los Angeles Health Services
  • Contractor: Morrow-Meadows Corporation

Redondo Beach Unified School District

03/05/12 0 COMMENTS

Redondo Beach Unified School DistrictRedondo Beach union high school

  • Scope of Work: Structured Cabling System, Intrusion Alarm System, Fire Alarm System, Gym Sound System, Wrestling Room Sound System
  • Client: Redondo Beach Union High School, Redondo Beach Unified School District
  • Contractor: Barnhart / Master K

Manhattan Beach Unified School District

03/05/12 0 COMMENTS

  • Scope of Work: Audio Visual Equipment, Master Clock Systems,¬† Premise Wiring, Intrusion Detection, Public Address Systems, Assistive Listening System.
  • Client: Mira Costa High School, Manhattan Beach Unified School District
  • Contractor: Bernards, Neubauer

Centinela Valley Union High School

03/05/12 0 COMMENTS

  • Scope of work: Fire Detection & Alarm System, and Basic Electrical Systems, Communications Equipment Room Fitting, Communications Backbone Cabling, Communications Horizontal Cabling
  • Lawndale High School, Centinela Valley Union High School District
  • Contractor: Pars Arvin

Orange Unified School District

03/05/12 0 COMMENTS

  • Scope of work: Fire Alarm Systems, Intrusion Detection, Structured Cabling, CCTV & Surveillance System, Television Systems, PA Rack / Clock, Extron Pole Vault PVS Kits & Battery Operated Clocks
  • Client: Lampson Elementary School, Orange Unified School District
  • Contractor: PW Construction

Arcadia Unified School District

03/05/12 0 COMMENTS

  • Scope of work: Structured Cabling System and Television Distribution System
  • Client: Camino Grove Elementary School, Arcadia Unified School District
  • Contractor: Delmac Construction & Dev’t., Inc.
 Page 1 of 3  1  2  3 »